Selecting the correct cable size for a long-distance feeder involves more than matching the conductor ampacity to the expected load. As the distance between the power source and the electrical equipment increases, voltage drop becomes an increasingly important factor. A cable that can safely carry the required current may still deliver insufficient voltage at the load if its conductors are too small or the feeder is too long.
This is particularly important in commercial buildings, industrial facilities, underground distribution systems, and other installations where electrical equipment is located far from the main distribution panel.
ACWU90 cable is commonly considered for Canadian low-voltage power distribution because its aluminum interlocked armour provides mechanical protection, while its cross-linked polyethylene (XLPE) insulation and overall jacket support a range of installation environments, depending on the specific product approval.
So, what size ACWU90 cable is needed for a long-distance feeder? The correct answer depends on several factors, including load current, operating voltage, conductor material, cable length, power factor, installation conditions, and the allowable voltage drop.
The following guide explains how to evaluate these factors and select a suitable conductor size without relying on ampacity tables alone.
1. What Factors Determine ACWU90 Cable Size for a Long Feeder?
A long-distance feeder should be evaluated using several electrical and installation criteria. The final conductor size must satisfy all applicable requirements, not just one calculation.
1.1 Load Current
Load current is the starting point for cable sizing. It represents the current that the feeder must deliver to the connected equipment under the design operating conditions.
For a single-phase circuit, the approximate load current is:
[I=\frac{P}{V\times PF}]
For a three-phase circuit:
[I=\frac{P}{\sqrt{3}\times V\times PF}]
Where:
(I) = load current in amperes (A)
(P) = real power in watts (W)
(V) = system voltage in volts (V)
(PF) = power factor
For example, a balanced three-phase load supplied at 600 V with a real power demand of 100 kW and a power factor of 0.90 has an approximate operating current of:
[I=\frac{100,000}{1.732\times600\times0.90}]
[I\approx106.9A]
This is the estimated operating current, not automatically the final conductor design current. Continuous loads, motor loads, and other specific applications may require additional sizing calculations under the applicable electrical code.
1.2 Feeder Length
Cable length directly affects voltage drop. The longer the conductor, the greater its electrical resistance and the more voltage is lost as current flows through it.
For voltage-drop calculations, use the actual one-way route length from the power source to the load. Do not confuse this with the total conductor length in a circuit.
For example, a 150 m feeder route has a one-way length of 150 m. In a single-phase circuit, current travels through both the outgoing and return conductors, so the calculation accounts for both paths. A balanced three-phase calculation uses a different formula.
1.3 Conductor Material
Many ACWU90 products use compact-stranded 8000-series aluminum alloy conductors. Some product configurations may differ, so the actual cable datasheet must be checked.
Aluminum generally has higher electrical resistance than copper for an equivalent conductor cross-sectional area. Consequently, an aluminum conductor may need a larger cross-sectional area than a copper conductor to achieve comparable voltage-drop performance.
However, aluminum offers advantages in weight and material cost, particularly in larger feeder installations.
1.4 Power Factor
Power factor affects the current required to deliver a given amount of real power. A lower power factor generally means higher current for the same real power demand.
Higher current increases voltage drop and conductor heating. Therefore, industrial feeders supplying motors, transformers, and other inductive loads should use an appropriate design power factor rather than assuming a value of 1.0.
1.5 Installation Conditions
Cable installation conditions also influence the final conductor selection.
Important factors include:
Ambient temperature
Number of current-carrying conductors
Cable grouping and spacing
Installation in cable trays, raceways, or underground
Soil thermal resistivity and burial conditions, where applicable
Conductor and equipment termination temperature ratings
A cable's 90°C insulation rating does not automatically mean that its allowable ampacity can always be calculated using the 90°C column. Equipment terminal temperature limitations and applicable code rules must also be considered.
2. Why Is Voltage Drop So Important for Long-Distance Feeders?
Voltage drop is the reduction in electrical voltage between the source and the connected load.
Every conductor has electrical resistance. When current flows through a conductor, some electrical energy is converted into heat, resulting in a voltage loss along the cable.
For a short feeder, this loss may be relatively small. However, as the distance increases, voltage drop can become significant.
2.1 What Happens When Voltage Drop Is Too High?
Excessive voltage drop can affect equipment performance and system reliability.
Common problems include:
Motors may experience reduced starting torque or difficulty starting.
Contactors and relays may operate unreliably.
Lighting systems may experience reduced brightness or unstable operation.
Electronic equipment may malfunction if the supply voltage falls outside its operating range.
Motors and other loads may draw increased current under certain operating conditions, potentially increasing heating.
The actual impact depends on the connected equipment and its voltage tolerance.
For this reason, voltage drop should be evaluated during the feeder design stage rather than after installation.
2.2 What Voltage Drop Limit Should Be Used?
A commonly used design target for low-voltage distribution is:
| Circuit section | Common design target |
|---|---|
| Feeder | 3% |
| Branch circuit | 3% |
| Combined feeder and branch circuit | 5% |
These figures are widely used engineering design targets, but they should not be treated as a universal legal requirement for every installation.
In Canada, the Canadian Electrical Code (CEC) and provincial or territorial adoption requirements govern the installation. The applicable edition, local amendments, and authority having jurisdiction must be checked.
For example, the Ontario Electrical Safety Authority's Bulletin 8-6-4 explains the application of Rule 8-102 to dwelling-unit installations. It describes a 3% limit for the feeder or branch-circuit portion and a 5% combined limit in the circumstances covered by its guidance.
Industrial and commercial projects should be evaluated under the requirements applicable to their specific installation rather than automatically applying residential examples.
3. How Do You Calculate Voltage Drop for ACWU90 Cable?
Voltage-drop calculations help determine whether a proposed conductor size is suitable for the feeder length and operating load.
The calculation method depends on whether the circuit is single-phase or three-phase.
3.1 Single-Phase Voltage-Drop Formula
For a single-phase AC circuit, a commonly used voltage-drop formula is:
[V_d=2\times I\times L\times(R\cos\phi+X\sin\phi)]
Where:
(V_d) = voltage drop in volts
(I) = load current in amperes
(L) = one-way cable length in kilometres
(R) = AC conductor resistance in ohms per kilometre
(X) = cable reactance in ohms per kilometre
(\phi) = power factor angle
The factor of 2 accounts for the outgoing and return current paths in a single-phase circuit.
3.2 Three-Phase Voltage-Drop Formula
For a balanced three-phase AC circuit, the commonly used formula is:
[V_d=\sqrt{3}\times I\times L\times(R\cos\phi+X\sin\phi)]
Where the variables have the same meanings as above.
The percentage voltage drop is calculated as:
[%V_d=\frac{V_d}{V}\times100]
Where (V) is the nominal line-to-line voltage for a three-phase circuit.
For example, if a 600 V three-phase feeder has a calculated voltage drop of 18 V:
[%V_d=\frac{18}{600}\times100=3%]
This means the voltage drop along the feeder is 3% of the nominal system voltage.
3.3 Why Should You Use AC Resistance Instead of Only DC Resistance?
Cable manufacturers sometimes publish maximum DC conductor resistance at 20°C. This information is useful for evaluating conductor characteristics, but it is not always sufficient for an accurate AC voltage-drop calculation.
AC resistance can differ from DC resistance because of factors such as:
Conductor operating temperature
Skin effect
Proximity effect
Conductor construction and cable arrangement
Cable reactance also contributes to voltage drop, particularly in larger conductors and certain three-phase configurations.
For accurate engineering calculations, use the manufacturer's published AC resistance and reactance data at the relevant operating conditions, or use an accepted calculation method with suitable conductor and cable parameters.
Do not substitute a DC resistance value directly into an AC voltage-drop calculation without checking whether the method and assumptions are appropriate.

4. Step-by-Step Method for Selecting ACWU90 Cable Size
A practical selection process should begin with the electrical load and finish with a complete verification of the installation.
Step 1: Determine the Load and Design Current
Identify the connected equipment and calculate the expected operating current.
For industrial applications, determine whether the feeder supplies:
General distribution loads
Motors
Transformers
HVAC equipment
Industrial machinery
Mixed loads
Apply the relevant demand, continuous-load, and motor-feeder requirements under the governing electrical code.
Do not assume that the operating current alone is always the correct value for conductor sizing.
Step 2: Confirm the System Voltage and Phase
Identify whether the feeder is:
Single-phase
Three-phase
Also confirm the nominal system voltage, such as 120/240 V, 208Y/120 V, 480Y/277 V, or 600 V, as applicable.
A higher system voltage generally reduces current for the same power demand. This can help reduce voltage drop, although the equipment voltage rating and system design must support the selected voltage.
Step 3: Measure the One-Way Feeder Length
Determine the actual cable route from the source to the load.
For underground installations, include the complete route through the trench, duct bank, and equipment entry points.
For cable tray installations, measure the actual route rather than relying on straight-line building distances.
Where the feeder has multiple sections with different conductor sizes or operating conditions, evaluate each section appropriately.
Step 4: Select a Preliminary Conductor Size Based on Ampacity
Use the applicable Canadian Electrical Code ampacity tables or another governing code method to identify a preliminary conductor size.
The calculation should account for:
Conductor material
Insulation temperature rating
Number of current-carrying conductors
Ambient temperature
Cable grouping
Installation method
Termination temperature limitations
The resulting ampacity must be adequate for the calculated design current and applicable overcurrent protection requirements.
Step 5: Calculate Voltage Drop
Using the preliminary conductor size, obtain the appropriate resistance and reactance data from the cable manufacturer.
Calculate the voltage drop based on:
Design current
One-way cable length
System phase
Operating power factor
Conductor operating temperature
Cable electrical characteristics
Then compare the calculated percentage voltage drop with the project's design target and applicable requirements.
Step 6: Increase the Conductor Size if Necessary
If the calculated voltage drop is excessive, select a larger conductor size and repeat the calculation.
For example, a feeder may have sufficient ampacity with a smaller conductor, but the voltage-drop calculation may require a larger conductor because of the long route.
This is a common reason why long-distance feeders are sized above the minimum ampacity requirement.
Step 7: Check Short-Circuit and Protection Requirements
A conductor must also withstand the thermal and electrical stresses associated with a fault until the protective device clears it.
Verify:
Available fault current
Protective-device interrupting rating
Protective-device clearing time
Conductor short-circuit withstand capability
Bonding and grounding arrangements
Applicable code requirements
Do not assume that passing the ampacity and voltage-drop checks automatically means the cable is suitable for the complete installation.
5. Example: How Does Feeder Length Affect ACWU90 Cable Size?
Consider a hypothetical industrial installation with the following design information:
| Parameter | Example value |
|---|---|
| System voltage | 600 V |
| Supply type | Three-phase |
| Real power demand | 100 kW |
| Power factor | 0.90 |
| One-way feeder length | 150 m |
| Conductor material | Aluminum |
| Cable type under evaluation | ACWU90 |
| Initial voltage-drop target | 3% |
Step 1: Calculate the Load Current
[I=\frac{100,000}{\sqrt{3}\times600\times0.90}]
[I\approx106.9A]
The calculated operating current is approximately 106.9 A.
The actual design current must still be established after applying any relevant continuous-load, motor, demand, or other code requirements.
Step 2: Convert the Feeder Length
The one-way cable length is:
[L=150m=0.15km]
Step 3: Establish the Maximum Target Voltage Drop
For a 600 V system with a 3% design target:
[V_d=600\times0.03=18V]
The feeder voltage drop should therefore be evaluated against an 18 V target.
Step 4: Evaluate Candidate Conductor Sizes
The engineer should obtain the AC resistance and reactance data for each candidate ACWU90 size.
The voltage-drop formula is:
[V_d=\sqrt{3}\times106.9\times0.15
\times(R\times0.90+X\times0.436)]
Here, 0.436 is approximately the sine of the power factor angle when the power factor is 0.90.
Each candidate conductor size can then be evaluated against the 18 V target.
Step 5: Complete the Ampacity and Protection Checks
After identifying a candidate size that meets the voltage-drop target, verify its corrected ampacity, termination compatibility, fault withstand, and overcurrent protection requirements.
Important: This example demonstrates the calculation process, not a final cable-size recommendation. A specific AWG or kcmil size cannot be responsibly selected without verified AC resistance and reactance data, the applicable ampacity conditions, and the complete project design requirements.

6. Should You Choose a Larger ACWU90 Cable for a Long Feeder?
In many cases, a larger conductor is the practical solution when a long feeder produces excessive voltage drop.
However, selecting a larger cable should be based on engineering calculations rather than simply choosing the next available size.
6.1 Advantages of Increasing Conductor Size
A larger conductor generally offers:
Lower electrical resistance
Reduced voltage drop
Lower conductor losses at the same current
Greater thermal capacity under suitable installation conditions
These benefits can be important in industrial facilities where equipment operates for extended periods.
6.2 What Are the Trade-Offs?
A larger ACWU90 cable also has practical disadvantages:
Higher material cost
Greater cable weight
Larger outside diameter
More demanding cable handling and pulling
Potentially larger cable glands and termination accessories
Greater space requirements in cable trays and equipment enclosures
The selected cable must also be compatible with the available terminals and approved installation method.
For aluminum conductors, confirm that the connectors and equipment terminals are identified for aluminum conductor use and that the manufacturer's installation instructions are followed.
6.3 Can Parallel ACWU90 Cables Be Used?
For some high-current or long-distance feeders, multiple parallel conductors or cable runs may be considered.
Parallel conductors can increase the effective conductor area and reduce resistance when correctly designed.
However, parallel installations require careful attention to:
Minimum conductor size permitted by the applicable code
Equal conductor lengths
Matching conductor material and size
Identical installation conditions
Correct phase arrangement
Current sharing
Termination and equipment compatibility
Bonding and grounding requirements
Parallel conductors should not be treated as a simple way to divide the load current without checking the applicable code rules.
7. How Do Installation Conditions Affect Long-Distance ACWU90 Feeders?
A conductor size that works in one installation may not be suitable in another. The installation method affects both ampacity and practical cable selection.
7.1 Underground Installation
ACWU90 products with the appropriate approval and markings may be suitable for direct earth burial or underground applications.
However, underground feeder design should consider:
Soil temperature
Soil thermal resistivity
Burial depth
Cable spacing
Grouping with other underground circuits
Moisture exposure
Mechanical protection
Local installation requirements
Underground thermal conditions can affect conductor temperature and allowable ampacity. A cable selected using an unsuitable installation assumption may not perform as expected.
7.2 Cable Tray Installation
For industrial cable tray installations, verify the applicable ampacity requirements for the tray type and cable arrangement.
Important considerations include:
Ventilated or non-ventilated tray construction
Cable spacing
Number of cables
Number of current-carrying conductors
Ambient temperature
Cable support and mechanical protection
Cable grouping can reduce allowable ampacity, so the installation arrangement should be included in the design calculation.
7.3 Outdoor and Wet Locations
The specific ACWU90 product must be approved for its intended environmental conditions.
Verify the cable's voltage rating, wet-location suitability, sunlight resistance, temperature classification, and other required markings from the manufacturer's datasheet and certification records.

The ACWU90 designation alone should not be used as proof of every additional environmental rating.
8. ACWU90 Cable Size Selection: Common Mistakes to Avoid
| Common mistake | Why it causes problems | Better approach |
|---|---|---|
| Selecting cable based only on ampacity | The voltage drop may be excessive over a long route | Check both ampacity and voltage drop |
| Using the wrong cable length | Voltage-drop calculations become inaccurate | Use the actual one-way route length |
| Ignoring power factor | The calculated current and voltage drop may be incorrect | Use the expected operating power factor |
| Treating 90°C insulation as a universal ampacity allowance | Termination ratings and code rules may limit allowable ampacity | Check conductor, equipment, and code limitations |
| Using DC resistance without review | AC impedance may differ from DC resistance | Use appropriate AC resistance and reactance data |
| Ignoring underground thermal conditions | Soil conditions can affect allowable ampacity | Use the applicable underground calculation method |
| Assuming all ACWU90 products are identical | Construction and additional ratings can vary | Verify the exact product datasheet and certification |
| Increasing cable size without checking terminations | Larger conductors may not fit existing equipment terminals | Confirm lug and enclosure compatibility |
9. Which Standards Should Be Considered When Selecting ACWU90 Cable?
Cable product standards and electrical installation codes serve different purposes. Buyers and engineers should verify both before approving a long-distance feeder design.
9.1 Canada: CSA and the Canadian Electrical Code
In Canada, ACWU90 is covered by the relevant requirements of CSA C22.2 No. 51, Armoured Cables.
The Canadian Electrical Code (CEC), CSA C22.1, governs electrical installation requirements, including conductor ampacity, overcurrent protection, and voltage-drop considerations.
The product standard and installation code should not be confused: compliance with the cable product standard does not by itself establish that a particular feeder installation is correctly designed.
Also, the CEC is adopted and administered through provincial and territorial regulatory systems. The applicable edition and local amendments must be confirmed for each project.
9.2 United States: UL and NEC
For projects in the United States, verify the cable type and product certification required by the National Electrical Code (NEC) and the authority having jurisdiction.
Canadian ACWU90 approval does not automatically mean that a cable is listed for every US application.
A suitable US-listed cable type, such as an applicable metal-clad or other approved wiring method, may be required depending on the project.
9.3 IEC and AS/NZS Markets
For international projects, do not assume that the Canadian ACWU90 designation is automatically accepted under IEC-based or AS/NZS-based requirements.
The cable's construction, voltage rating, certification, installation method, and local regulatory approval must be checked against the requirements of the destination market.
A cable suitable for a Canadian feeder project may require a different product approval or construction for another country.

10. Long-Distance ACWU90 Feeder Selection Checklist
Before approving a cable size or issuing a purchase order, confirm the following information:
Nominal system voltage and phase
Connected load and calculated design current
Continuous-load and motor-load requirements
One-way feeder route length
Expected power factor
Required voltage-drop target
Conductor material and proposed AWG/kcmil size
Manufacturer's AC resistance and reactance data
Applicable ampacity tables and correction factors
Equipment termination temperature rating
Short-circuit withstand and overcurrent protection
Cable installation method and environmental conditions
Cable voltage rating and certification
Compatible glands, connectors, and equipment terminals
Applicable local electrical code and authority requirements
Having these details available helps engineers, contractors, distributors, and procurement teams avoid selecting a cable that meets one electrical requirement but fails another.
11. Frequently Asked Questions
Q1: Does a longer feeder always require a larger ACWU90 cable?
Not necessarily. The required conductor size depends on the load current, voltage, power factor, conductor characteristics, installation conditions, and allowable voltage drop.
However, as feeder length increases, voltage drop generally becomes more significant. A larger conductor may therefore be required even when the original conductor has sufficient ampacity.
Q2: Is ACWU90 suitable for a 100 m or 200 m feeder?
It may be suitable, provided the specific cable product is approved for the installation and the conductor size satisfies the electrical design requirements.
There is no universal maximum feeder length for ACWU90. A 100 m feeder carrying a small load may have acceptable voltage drop, while a much shorter feeder carrying a larger load may require a larger conductor.
Q3: Should voltage drop or ampacity determine the final cable size?
Both must be checked.
The final conductor size must satisfy the applicable ampacity, voltage-drop, termination, short-circuit, and overcurrent protection requirements. The most demanding applicable criterion may determine the final size.
Q4: Can I use a 90°C temperature rating to reduce ACWU90 conductor size?
No. The 90°C rating identifies the maximum conductor operating temperature associated with the insulation system under specified conditions. It does not automatically determine the allowable ampacity of the complete installation.
Applicable ampacity tables, correction factors, and equipment termination limitations must be considered.
Q5: Is aluminum ACWU90 suitable for long-distance feeders?
Aluminum ACWU90 can be suitable for many fixed power distribution applications when the cable is properly selected and approved.
Because aluminum has higher electrical resistance than copper for an equivalent conductor size, the required aluminum conductor may need a larger cross-sectional area to meet the same voltage-drop target.
Its lower weight and material cost can make it an attractive option for larger feeder projects.
Q6: Can two or more ACWU90 cables be installed in parallel to reduce voltage drop?
Parallel conductors may be used where permitted by the applicable electrical code and where the installation is properly engineered.
Conductor size, length, material, routing, current sharing, termination, and protection must all be considered. The installation must also satisfy the applicable requirements for parallel conductors.
Conclusion
Selecting the correct ACWU90 cable size for a long-distance feeder requires more than checking the expected load current. Engineers and contractors must evaluate voltage drop, conductor ampacity, power factor, feeder length, installation conditions, termination ratings, and short-circuit protection together.
A larger aluminum conductor may be necessary when a long feeder produces excessive voltage drop, even if a smaller conductor appears adequate based on ampacity alone. Using verified manufacturer electrical data and the applicable installation code helps ensure that the selected cable meets both electrical and practical project requirements.
For distributors, contractors, and procurement teams, confirming the complete feeder specification before ordering is an important step toward avoiding undersized cables, unnecessary material costs, and installation delays.
GERITEL WIRE – ACWU90 Cable Solutions for Long-Distance Feeders
Choosing the right ACWU90 cable for a long-distance feeder requires reliable product specifications and careful attention to conductor size, electrical performance, and installation requirements. GERITEL WIRE supports electrical contractors, distributors, engineering companies, and equipment manufacturers with ACWU90 aluminum armored cable solutions for commercial, industrial, and power distribution projects. Whether your project requires a particular AWG or kcmil size, conductor configuration, cable length, or technical documentation, our team can discuss your requirements and help you identify a suitable product specification. Contact GERITEL WIRE to discuss your next feeder cable project and request a quotation.
Dongguan Greater Wire & Cable Co., Ltd.
Tel/WhatsApp/Wechat: +86 136 6257 9592
Tel/WhatsApp/Wechat: +86 135 1078 4550
Email: manager01@greaterwire.com
Website: www.greaterwire.com